1.
Albayrak G, Özdemir İlker. Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO. RDLC [Internet]. 2018Aug.31 [cited 2024Nov.15];17(2):304-18. Available from: http://146.155.94.136/index.php/RDLC/article/view/2089