E. Arriagada, R. and F. Ararcón C., L. (2014) “Quantification of Productivity Changes Due to Work Schedule Changes in Construction Projects. A Case Study”, Revista de la Construcción. Journal of Construction, 13(1), pp. 09–14. Available at: http://146.155.94.136/index.php/RDLC/article/view/13566 (Accessed: 15November2024).